One App for
Solar & Storage

Site Survey
Automation

From sales contract signed, to plan set, permit, and interconnection
applications submitted in minutes, not days or weeks!

The System is Broken

3+ months, 7+ Employees, disjointed tools, handoffs galore, everyone reprocessing the same data.

Software Subscriptions + Subcontractor/Partner Platforms = Too Many Apps

Proposal Tool
CRM
ERP
Design Software
Inventory
File Storage
Site Survey
Email/Chat
Spreadsheet
Calendar
Permit Portals

Sales to PTO Process…. Riddled with Setbacks

See how projects are delayed in traditional workflows below

  • Data Processing + Risk Origination + Handoff

    Little to no project data collected

    This is where the whole team gets to work to collect data the sales team didn’t. Missed details here can have cascading effects.

  • Waiting + Handoff

    Waiting 3 – 7 days for a site survey is typical

    Tech dispatch is manual. Customer’s already checking competitors while you hunt for an open slot.

  • Waiting + Data Processing + Risk Origination + Handoff

    The data collection starts, but who knows if it’s finished?

    Site techs often lack comprehensive tools or experience that aid them in collecting the right info specific to their project system and site requirements. When details are missed, additional truck rolls occur and projects are delayed by weeks.

  • Waiting + Re-processing data + Risk Origination + Handoff

    Missing survey data and missing the permitting mark

    Site survey reports often lack all the info a Designer needs to complete a plan set. Manual Designer processes lead to human errors, permit rejections, lots of back-and-forth, and weeks of delays.

  • Waiting + Re-processing data + Risk Origination + Handoff

    PE can flag design issues or miss critical requirements

    PE can kick the project back to design which may or may not lead to design rework and additional truck rolls. Relying on PE to stay up to date on structural calc requirements per AHJ.

  • Waiting + Re-processing data + Risk Origination + Handoff

    Tribal Knowledge vacuum

    Every AHJ & Utility wants something different. One missed requirement, design, engineering, and site survey can reset.

  • Waiting + Re-processing data + Risk Origination + Handoff

    AHJ Redlines due to lack of communication and subject matter expertise.

    2-6 weeks in queue. Reviewer flags issues, the cascade goes deep. Why was it rejected? Plans missed the mark. Reviewer couldn’t tell where the info was on the plans. Reviewer isn’t familiar with code or equipment and demands the most.

  • Waiting + Risk Origination + Handoff

    No Permit, no install, no M2 or final funding

    We’re weeks or worse, months since contract has been signed and we’re still battling compliance issues and the homeowner is threatening to cancel. On the other end of the spectrum, you can’t get a hold of the homeowner to schedule an install date.

  • Waiting + Re-processing data + Risk Origination + Handoff

    Wrong specs caught late and equipment shortages can cause rework and delays

    BOM building, inventory management, inaccuracies. Equipment shortages. Equipment changes can lead to complete system redesigns after the system has been permitted. You know the drill — more delays and hours spent fixing the issue.

  • Waiting + Re-processing data + Risk Origination + Handoff

    Scope Change, documents not in compliance, everyone can be doing rework

    Financing kicked your plans back for non-compliance while requirements continually change. Things can potentially go back to sales to rework the whole deal and resetting everything to square one.

  • REWORK RISK

    Rework Trigger: Utility Kicks It Back

    Utility flags interconnection issue. Engineering and design both revisit. 1–4 weeks lost per cycle.

  • Waiting + Re-processing data + Risk Origination + Handoff

    Installation roulette

    Crew hits the site. Will they follow the plans? Are the plans accurate? Did Operations and AHJ/Utility catch all potential violations and pitfalls? Missed details can cause crews to make changes on the fly or reschedule installs.

  • Waiting + Re-processing data + Risk Origination + Handoff

    The moment of truth

    Design errors, hardware defects, software compatibility, and communication issues are discovered. Complex systems could take days, multiple truck rolls, or even equipment swap outs which can erode margins and push projects back to the drawing board.

  • Waiting + Handoff

    Hurry up and wait

    5-7 days after physical install, the inspection is scheduled 1-2 weeks out, or longer. You can almost taste that final financing payout.

  • Waiting + Re-processing data + Risk Origination + Handoff

    Will they, or won’t they

    Did you know about the “rough” inspection? Does the Inspector have proper access? Are there equipment or label mismatches on the plans verses what’s installed? Is everything in compliance? Will we pass? Over 25 - 37% of projects will not pass the first time.

  • Waiting + Re-processing data + Risk Origination + Handoff

    Sweet victory! My final payout is…. held up

    After waiting weeks after a passed inspection and receiving PTO, 10% - 30% of the project cost can still be held up by financing due to document discrepancies, lack of completion verification and proof of inspection. When final payout is received, closing the deal would only be but a fond memory of months past… hopefully.

The Skyfire Difference: Everything at Once, From One App

Every workstream running in parallel. Every decision compliance-checked. Every stakeholder on the same page.

Sales Proposal
Tool

skyfireapp.io/projects

Johnson Residence

Project #2481 · Mesa, AZ

Roof Pitch

7:12

Array Size

11.2 kW

Modules

28

Status

Permit Ready

Plan Set

Instant!

Building Permit

Instant!

Interconnection

Instant!

Inventory

Instant!

Homeowner

Instant!

Analytics

Instant!

See if Skyfire is Right for You

I'm Ready To Take The Next Step